Case study
Sydney house fire rebuild
Sydney, NSW
- Category
- Insurance Repairs
- Location
- Sydney, NSW
- Duration
- 14 weeks
- Completed
- April 2026
- Client
- Insurer
Project overview
A two-storey residence required a full structural rebuild after a kitchen fire spread through the upper level. We worked direct with the insurer and loss adjuster from make-safe through to hand-back, coordinating every trade and documenting each milestone to insurer-grade standards.
Scope
What we did
- Make-safe and structural assessment
- Replace roof framing and sheeting
- Strip and rebuild upper-level interiors
- Kitchen and bathroom replacement
- Repaint full interior
- Hand-back with warranty pack